




SERIN SECOND HAND
11 111EUR
- ≈ 211 360 ZAR





SERIN Fuel Oil Aluminium Tanker
65 000EUR
- ≈ 1 236 469 ZAR





SERIN Stainless Steel Tanker 32 m³





KÄSSBOHRER L4BH Chemical ADR
69 600EUR
Price excl. VAT
- ≈ 1 323 972 ZAR





Kadatec KA350C LPG-Propane Butane
69 000EUR
Price excl. VAT
- ≈ 1 312 559 ZAR





Sievering 45000 LITRES ADR SEMI REMORQUE CITERNE DE CARBURANT





Sievering 40000 LITRE ADR FUEL TANK SEMI-TRAILER FOR MERCEDES ACTROS





Spitzer SF2730PI/SF39PI - 1er Main endommagée






Others KADATEC KA350C, LIFTING AXLE, LPG - PROPANE BUTANE, ADR, 53m³
67 500EUR
- ≈ 1 284 025 ZAR





Magyar Bitumen tank inox 31 m3 / 1 comp ADR 10-04-2023
18 500EUR
Price excl. VAT
- ≈ 351 918 ZAR





Others KADATEC KA350C, LIFTING AXLE, LPG - PROPANE BUTANE, ADR, 53m³
67 500EUR
- ≈ 1 284 025 ZAR





Heil / Thompson Fuel tank alu 45 m3 / 6 comp + pump / ADR 13/12/2023
25 500EUR
Price excl. VAT
- ≈ 485 076 ZAR





Magyar Bitumen tank inox 29.5 m3 / 1 comp + pump / ADR 13/12/2023
19 500EUR
Price excl. VAT
- ≈ 370 940 ZAR
New Tank semi-trailer for transportation of fuel Serin 2023
See similarThe seller didn't indicate the price
This ad is stored in the archive for reference (specifications, typical price). There are no outdated ads on the site — all active options can be found below.
Fifth Wheel Height —1300mm. Suitable for 6x4 truck
Body —Cylindrical
King Pin —2”king – pin detachable from below made by
SAE standards 8 bolt type.
Volume —Total Net Volume: 42.000 lt
—Six Compartment
Axles —3 x 12000 kg carrying capacity Serin Drum Axle brand
Distance between Axles —1320 mm
Brake and Suspension System —Air Suspension
—Drum Brake System
—ABS WABCO Brake System
—Pneumatically drainage safety valve
Landing Gears —Double Speed,
—24000 kg carrying capacity,
—JOST brand mechanical Landing Gears,
Rear Bumper —Suitable 70/221 / AT-version of the rear bumper,
The rear overhang —Distance from the end of the tank on the bumper should be more then 300mm
Wheel Chock —Carriers with 1 unit wheel chock
Tires & Wheels —6 +1 PCS 385 / 65 R 22,5
—Goodyear-Pirelli
Loading, unloading System —Suitable for loading from top,
—On the left side of tanks to be one 4”API cabling Sening Or Niehuser with the cap it will be
discharge manufault valve and Diameter of 4” inches (in
locked Box)
—Six pcs. 500mm manhole cover to be suitable for loading from top
Overfill Pool — It is design for prevention of spilling fuel all over the tank body and overfill fuel is disposed by two drain hoses mounted on the rear side of the tanker body.
Walking Platform(Cat walk)
—The rough surface on the side with all the length of the pool within walking paths,
—The ladder should be located on the front
Mudguard —1 pcs galvanized steel mudguards with plastic edges.
Spare Tire Carrier —Two spare tire basket
Box —1 unit Tool Box,
—1 unit Insulated Food Box,
—1 unit Discharging Box (Left side of the Tanker),
—2 units each of 6 kg of fire tube with holder
Hoses —3” hoses with carrier
Water Tank —60 lit water tank which is made of stainless steel.
Paint —Steel Material surface are cleaned by grit metal and send how shot is blasted on the surfaces Of the metal.
—2 Floor Epoxy primers are made and paint will be choose on demand of the customer,
Electrical Equipment and Lighting —There are amber-colored lights in the side by 3 units,
—Park at the rear lamps,
—Reflector triangles,
—Electrical system; Flame proof electrical system
—2 X 7-pin electrical socket.
—Stop lights with protective grill
Accessories —Hub key,
—Axles Bolt Nut key,
—Tool box keys,
This offer is for informational purposes only. Please confirm details directly from the seller.
The seller didn't indicate the price
This offer is for informational purposes only. Please confirm details directly from the seller.










